Introduction Schedules for clients and projects in TO3000, Version 9.0 can be used to obtain a visualized representation of work processes. Schedules provide a comprehensive view of project and job intensity at any given moment. Two kinds of the Schedules are provided for each of the listed parts of TO3000, Version 9.0:
General issues on schedules On the left panel of any Schedule tab the names of the jobs or projects (depending on the particular Schedule) are displayed. The schedules are represented in the form of horizontal bars, spanning through a grid in which each column represents a certain time unit (hour, 8 hours, 12 hours or day).
The color of the schedule bar represents the status of the process it displays:
Schedules are displayed for certain period. To specify the period you want to be displayed, use Selected Period drop-down lists (select two dates: from-to). To apply the selected time period click Apply button. Thus only schedules which fall between the two assigned dates will be displayed. The column scale of the calendar can be 1 day, 12 hours, 8 hours or 1 hour.
Use Column Scale drop-down list to specify the necessary value: The set of available values for calendar graduation varies depending on the length of the selected period.
The width of the columns representing jobs can range from small to large. Use Column width options to specify the necessary value: